Cost & bill of quantitiesApril 2, 2026 · 5 min read

Cost Control according to DIN 276: Predicting Budget Overruns instead of Determining Them Retroactively

Budget overruns announce themselves creeping. We show how you seamlessly compare cost frameworks, estimations, and calculations.

Cost certainty is the holy grail of every construction project. Still, statistics show that nearly 60% of all residential and commercial projects exceed their planned budget. The main reason is not the lack of planning data, but the lack of continuous, phase-spanning cost control.

The Multi-Stage Model of DIN 276

DIN 276 provides a clear cost structure spanning multiple phases:

1. Cost Framework (LPH 1-2): First, rough assessment of requirements.
2. Cost Estimation (LPH 3): Detail based on the preliminary design.
3. Cost Calculation (LPH 4): Basis for permit planning and tenders.
4. Cost Proposal (LPH 7): Results of tenders and bids.
5. Cost Determination (LPH 8): Actually incurred costs after billing.

"The problem in classic office life is that these phases sleep in separate Excel sheets. If the actual bid prices in LPH 7 deviate from the estimation, planners often only notice after the contract has been awarded." — Sarah Neubauer

How PLANUM Forecasts Budget Deviations Live

PLANUM brings all phases of DIN 276 together in a single, comparative cost matrix. As soon as quotes are read via the AI price scan, PLANUM automatically compares the unit prices with the original cost calculation.

If the quote prices in a cost group deviate by more than a defined percentage, the system immediately alarms and forecasts the cost development for the total project. This allows planners to take corrective action (e.g. through redesign or material change) before contracts are signed.